time and motion study
 

Maintenance Management Resources
Six sigma and lean manufacturing, it's all about money:
Business Industrial Network is your best resource when you need fast solutions. After you view this six sigma area dedicated to learning the true cost of equipment downtime with time and motion study, please visit our company.

 

 
True Cost of downtime
Spacer Spacer

TDC - Bottleneck-Factor Category

     Add to favorites

six sigma, six sigma tools, lean manufacturing, time and motion study

 

 

This category is a 'one time' entry of a constant, updated annually. Most have not identified all the bottlenecks in their systems, and the percentage of each affects their production. Your existing method of calculation need only meet the TDC recommendations below.

Bottleneck
  • Identifying bottleneck cost can save thousands
  • Example: an industry accepted cost of a corrugator is $10,000 per hour (varies by facility).
List other downstream equipment, and % of affect on downstream and upstream equipment.
  • Other Bottlenecks in this example of a corrugated facility… Boiler, Glue system, Air compressor, Strapper, Facility Power, etc.

 

After visiting 100s of paper plants, I have seen the same misconception. It is well known that the corrugator is a bottleneck, because the entire facility is it’s downstream. So much so, they will run at top speed (not necessarily most efficient speed), with speed indicator in the production manager’s office. 

In many of those facilities, all material will flow through a single strapper, or conveyor, but these do not get a tenth of the investments of resources that the corrugator does.  With this example the facility becomes a push production process, with storage, scrap, multiple handling, labor, etc., being the buffer and profit loss. With TDC, the question would no longer be "how can we have record production rates off of the corrugator while having reduced sales, quality, safety, and profits?" 

The other bottleneck examples above, like an air compressor, are not realized in the day to day management decisions, until the unrecognized bottleneck shuts down the facility, or a large portion thereof.

As time goes by after a bottleneck makes itself know, it once again drops out of the spotlight in the daily decisions. Actually a bottleneck should be identified and classified, hopefully before a failure, but a least afterwards. This is one of the key advantages of the TDC method, and one of the greatest cost savings too.

Ironically, TDC represents the final bottlenecks to a fully integrated and auditable approach to maintenance strategy development / justification

 

New Document
Please use the Content Navigation Menu below to share in discussions about "Bottleneck Category" or look up other related content.
 
Spacer

Corporate Sponsors

Supporting the True Cost of Downtime with their product and services

PLC Training

PLC training

maintenance-engineering-books

Automation training 

reliability-award

oee-production-process

 
 
Spacer Spacer
MAIN:  Home | TDC | Standards | OEE | Glossary | Download | Search | Feedback
TDC:  Equipment | Labor | Downtime | Link to us | Site Content Page | Awards
Other:  Contact Us | About DT
Entire Site Map